Environmental Site Assessment & Subsurface Investigation Institutional Building Holyoke, MA |


|
Test pit at the former UST grave. |
|
Site Plan showing former building and test pit locations. |
|
CASE STUDY |
|
Site Assessment |
|
Confirmed asbestos-containing pipe insulation. |
|
· Former foundations and demolition debris were observed within each of the other test pits. Laboratory results on one soil sample from the demolition debris was reported to have concentrations above the MCP Reportable Concentrations for several of the EPH analytes. · The results triggered a 120-day reportable condition; the property owner had 120 days to remediate the condition under the Limited Removal Action (LRA) provisions of the MCP [310 CMR 40.0318], or report the release to DEP. · The results triggered a 120-day reportable condition; the property owner had 120 days to remediate the condition under the Limited Removal Action (LRA) provisions of the MCP [310 CMR 40.0318], or report the release to DEP. |